Environmental & Compliance

1. Do your products meet major international environmental standards? What certifications do you have?

Answer: Our products have multiple certifications:

  • EU: REACH compliance (SVHC notification completed), RoHS 2.0.
  • Southeast Asia: Compliant with local VOC limits.
  • Custom certifications for specific markets available. Full certification files (SGS, ITS) provided upon cooperation.

2. What is the VOC content? Are these low-VOC products?

Answer:

  • UV coatings: VOC ≤50g/L, below EU limits.
  • Water-based coatings: VOC ≤70g/L, meets EU Eco-label and US EPA low-VOC standards. Batch-specific VOC reports available.

3. Do your products contain heavy metals or formaldehyde?

Answer: No.

  • Heavy metals (Pb, Cd, Hg, Cr6+) comply with EU RoHS 2.0 and US CPSIA ≤100ppm.
  • Formaldehyde <0.1g/kg. Safe for indoor furniture and children's products.

 

Orders & After-Sales

1. Minimum order quantity (MOQ)? Are samples available?

Answer:

  • Standard products: 500kg/variant. Custom: 1000kg/variant.
  • Free sample: 1kg/variant; customer pays shipping. 1–3 days for delivery.

2. Production and delivery time?

Answer:

  • Standard: 7–10 days; custom: 10–15 days.
  • Domestic ports: 1–2 days after production. Overseas: EU/US East 30–45 days, US West 25–35 days, SE Asia 10–15 days. Air shipping 3–7 days, extra cost.

3. How to handle quality issues?

Answer:

  • Report with photos/data within 7 working days.
  • Tech team verifies in 3 days; may request 1kg sample.
  • Confirmed quality issue: free replacement, refund, or discount within 5 days, including logistics. Non-quality issues: provide technical guidance.

4. What technical support do you provide?

Answer: Full lifecycle support:

Pre-sale: Product selection, application plan.

During sale: Manuals, videos, remote guidance.

Post-sale: 24h response, 48h solution, optional on-site/remote training.

 

Customization & Cooperation

1. Can coatings be customized to specific performance requirements? Process?

Answer: Yes. Process:

  • Provide detailed requirements, substrate, usage.
  • R&D evaluates feasibility in 3 days, provides proposal and quote.
  • Sample development fee paid, sample produced in 7–10 days with test report.
  • Approve sample, sign contract, place order at custom MOQ. Progress updates during production.

2. Do you support OEM/ODM cooperation? Requirements?

Answer: Yes.

  • OEM: Provide brand/logo, packaging design; MOQ 1000kg/variant; full service including labeling.
  • ODM: Provide product function, performance, scenario; MOQ 2000kg/variant; R&D, sample, production, certification; 30–60 days depending on complexity. Contract required.

3. Will you provide product testing and certification documents after cooperation?

Answer: Yes. Full documentation:

  • Basic: COA, SDS.
  • Certifications: REACH, RoHS, FDA.
  • Custom: Assistance for specific market certifications (UL, CE) if needed. Documents in Chinese and English for international use.